27ea40605e4d6b7f

NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf

NASA·PURSUE_2026·pdf·25.5 MB

Scores

1.8
Document value
0.0
Cross-references
2.0
Provenance
3.3
Info density
2.3
Topic relevance
0.0
Anomalousness

Events this document cites (1)

OCR'd text preview (8 of pages)

Source: mistral_ocr · confidence ~95%

page 1
189
CONFIDENTIAL

DECLASSIFIED
Authority: NW 91526

CLASSIFICATION CHANGE
To UNCLASSIFIED
By authority of EO 11652, 6-1-72
Changed by Aborgan Date NOV 9 1973

GEMINI VII
TECHNICAL DEBRIEFING

December 23, 1965

NOTICE: This document may be exempt from public disclosure under the Freedom of Information Act (5 U.S.C. 552). Requests for its release to persons outside the U.S. Government should be handled under the provisions of NASA Policy Directive 1382.2.

CONFIDENTIAL
page 2
blank
page 3
CONFIDENTIAL

PREFACE

This preliminary transcript was made from voice tape recordings of the Gemini 7 flight crew debriefing conducted December 19 through December 21, 1965 at the Crew Quarters, Cape Kennedy, Florida.

Although all the material contained in this transcript has been rough edited, the urgent need for the preliminary transcript by mission analysis personnel precluded a final edit prior to its publication.

CONFIDENTIAL
page 4
1
page 5
CONFIDENTIAL

TABLE OF CONTENTS

|  Paragraph | Page Number  |
| --- | --- |
|  1.0 | COUNTDOWN  |
|  1.1 | Crew Insertion  |
|  1.2 | Communications  |
|  1.3 | Crew Participation in Countdown  |
|  1.4 | Comfort  |
|  1.5 | Environmental Control System  |
|  1.6 | Sounds  |
|  1.7 | Vibrations  |
|  1.8 | Visual  |
|  1.9 | Crew Station Controls and Displays  |
|  2.0 | POWERED FLIGHT  |
|  2.1 | Lift-Off cues  |
|  2.2 | Roll Program  |
|  2.3 | Pitch Program  |
|  2.4 | Aerodynamics  |
|  2.5 | Environmental Control System  |
|  2.6 | Maximum q  |
|  2.7 | Windshear  |
|  2.8 | DCS Updates
page 6
CONFIDENTIAL

14.0 TRAINING
14.1 Gemini Mission Simulator...185
14.2 DCPS (Launch abort simulator)...191
14.3 MAC Engineering Simulator...191
14.4 Translation and Docking Trainer...192
14.5 Planetarium...193
14.6 Systems Briefings...194
14.7 Flight Experiments...198
14.8 Spacecraft systems tests...202
14.9 Egress training...204
14.10 Parachute Training...205
14.11 Launch simulations...206
14.12 Reentry simulations...206
14.13 Simulated network simulations...206
14.14 Network simulations...206
14.15 Flight Plan training...207

15.0 CONCLUDING COMMENTS...208

CONFIDENTIAL
page 7
CONFIDENTIAL

7.0 LANDING AND RECOVERY
7.1 Impact...54
7.2 Checklists...55
7.3 Communications...55
7.4 Systems Configuration...58
7.5 Spacecraft Status...59
7.6 Postlanding Activity...62
7.7 Comfort...63
7.8 Recovery Force Personnel...63
7.9 Egress...63
7.10 Survival Gear...63
7.11 Crew Pick Up...64

8.0 SYSTEMS OPERATION
8.1 Platform...64
8.2 OAMS...65
8.3 RCS...73
8.4 ECS...75
8.5 Communications...91
8.6 Electrical...95
8.7 Onboard Computer...99
8.8 Crew Station...101
8.9 Biomedical...115

9.0 OPERATIONAL CHECKS
9.1 Apollo Landmark Investigation...122
9.2 Cabin Lighting Survey...130
9.3 HF T
page 8
CONFIDENTIAL

3.3 Insertion Activities...15
3.4 Post Station Keeping...17

4.0 ORBITAL FLIGHT...18

5.0 RETROFIRE
5.1 T_R-2:00 Power Up and Alignment Checklists...32
5.2 T_R-26 Events...33
5.3 T_R-5 GMT Stop Clock...34
5.4 T_R-256...34
5.5 T_R-1...34
5.6 T_R-0...35
5.7 Retropack Jettison...40
5.8 Communications...41
5.9 Updating...41
5.10 Post Retro Jettison Checklist...42

6.0 REENTRY
6.1 Reentry Parameters Update...42
6.2 400 K...43
6.3 Acceleration Profile...47
6.4 Spacecraft Control...47
6.5 100 K...48
6.6 50 K...48
6.7 35 K Checklist...49
6.8 Communications...49
6.9 26 K Checklist...49
6.

Full text and original imagery available on Internet Archive →