27ea40605e4d6b7f
NASA-UAP-D021_Gemini-7-Technical-Debriefing_1965.pdf
NASA·PURSUE_2026·pdf·25.5 MB
Scores
1.8
Document value
0.0
Cross-references
2.0
Provenance
3.3
Info density
2.3
Topic relevance
0.0
Anomalousness
Events this document cites (1)
OCR'd text preview (8 of pages)
Source: mistral_ocr · confidence ~95%
page 1
189 CONFIDENTIAL DECLASSIFIED Authority: NW 91526 CLASSIFICATION CHANGE To UNCLASSIFIED By authority of EO 11652, 6-1-72 Changed by Aborgan Date NOV 9 1973 GEMINI VII TECHNICAL DEBRIEFING December 23, 1965 NOTICE: This document may be exempt from public disclosure under the Freedom of Information Act (5 U.S.C. 552). Requests for its release to persons outside the U.S. Government should be handled under the provisions of NASA Policy Directive 1382.2. CONFIDENTIAL
page 2
blank
page 3
CONFIDENTIAL PREFACE This preliminary transcript was made from voice tape recordings of the Gemini 7 flight crew debriefing conducted December 19 through December 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. Although all the material contained in this transcript has been rough edited, the urgent need for the preliminary transcript by mission analysis personnel precluded a final edit prior to its publication. CONFIDENTIAL
page 4
1
page 5
CONFIDENTIAL TABLE OF CONTENTS | Paragraph | Page Number | | --- | --- | | 1.0 | COUNTDOWN | | 1.1 | Crew Insertion | | 1.2 | Communications | | 1.3 | Crew Participation in Countdown | | 1.4 | Comfort | | 1.5 | Environmental Control System | | 1.6 | Sounds | | 1.7 | Vibrations | | 1.8 | Visual | | 1.9 | Crew Station Controls and Displays | | 2.0 | POWERED FLIGHT | | 2.1 | Lift-Off cues | | 2.2 | Roll Program | | 2.3 | Pitch Program | | 2.4 | Aerodynamics | | 2.5 | Environmental Control System | | 2.6 | Maximum q | | 2.7 | Windshear | | 2.8 | DCS Updates…
page 6
CONFIDENTIAL 14.0 TRAINING 14.1 Gemini Mission Simulator...185 14.2 DCPS (Launch abort simulator)...191 14.3 MAC Engineering Simulator...191 14.4 Translation and Docking Trainer...192 14.5 Planetarium...193 14.6 Systems Briefings...194 14.7 Flight Experiments...198 14.8 Spacecraft systems tests...202 14.9 Egress training...204 14.10 Parachute Training...205 14.11 Launch simulations...206 14.12 Reentry simulations...206 14.13 Simulated network simulations...206 14.14 Network simulations...206 14.15 Flight Plan training...207 15.0 CONCLUDING COMMENTS...208 CONFIDENTIAL
page 7
CONFIDENTIAL 7.0 LANDING AND RECOVERY 7.1 Impact...54 7.2 Checklists...55 7.3 Communications...55 7.4 Systems Configuration...58 7.5 Spacecraft Status...59 7.6 Postlanding Activity...62 7.7 Comfort...63 7.8 Recovery Force Personnel...63 7.9 Egress...63 7.10 Survival Gear...63 7.11 Crew Pick Up...64 8.0 SYSTEMS OPERATION 8.1 Platform...64 8.2 OAMS...65 8.3 RCS...73 8.4 ECS...75 8.5 Communications...91 8.6 Electrical...95 8.7 Onboard Computer...99 8.8 Crew Station...101 8.9 Biomedical...115 9.0 OPERATIONAL CHECKS 9.1 Apollo Landmark Investigation...122 9.2 Cabin Lighting Survey...130 9.3 HF T…
page 8
CONFIDENTIAL 3.3 Insertion Activities...15 3.4 Post Station Keeping...17 4.0 ORBITAL FLIGHT...18 5.0 RETROFIRE 5.1 T_R-2:00 Power Up and Alignment Checklists...32 5.2 T_R-26 Events...33 5.3 T_R-5 GMT Stop Clock...34 5.4 T_R-256...34 5.5 T_R-1...34 5.6 T_R-0...35 5.7 Retropack Jettison...40 5.8 Communications...41 5.9 Updating...41 5.10 Post Retro Jettison Checklist...42 6.0 REENTRY 6.1 Reentry Parameters Update...42 6.2 400 K...43 6.3 Acceleration Profile...47 6.4 Spacecraft Control...47 6.5 100 K...48 6.6 50 K...48 6.7 35 K Checklist...49 6.8 Communications...49 6.9 26 K Checklist...49 6.…
Full text and original imagery available on Internet Archive →